Hector8256 Hector8256
  • 21-11-2022
  • Business
contestada

assume that painting an office building normally takes 10 days to complete and requires two workers, each earning $50/day. however, adding another worker can reduce the painting time to 8 days. what is the expedite cost per day for crashing the painting activity

Respuesta :

Otras preguntas

Solve for b. −1/3b=9 What is the answer? A −27 B −3 C 3 D 27
Which term is not matched with a correction definition? A) Supremacy clause - the Constitution is the highest law in the land B) Full faith and credit clause -
3. What is direct characterization? a statement about a character’s personality, appearance, habits, goals, values, and beliefs a descriptive clue that h
5x-4y=19 x-2y=8 Can someone please help me :))) Tenkss x
simplify (4m - 5n)^2
A coin is flipped and a random marble is picked from a bag of 10 marbles. Two of the marbles in the bag are red. What is the probability of the coin landing on
what is the volune of a sphere with a diameter of 2 inches?
a pool is being drained at a rate of 120 gallons per minute. what is the rate in liters per hour?
What actions taken by Marcus Garvey shocked civil rights leaders
T= [4 2] [5 0] [11 -1] [8 3] What is the address of element 11?