boopiee5941 boopiee5941
  • 23-05-2023
  • Business
contestada

A project has a beta of 1.17, the risk-free rate is 1.7%, and
the market risk premium is 5.3%. The project's expected rate of
return is _____%.

Respuesta :

Otras preguntas

write this in km 2000m
The tail of a kite is 1.5 feet plus twice the length of the kite. Together, the kite and the tail are 15 feet 6 inches long. What is the length of the tail?
Name the energy resource that involves extracting heat from rocks
The second angle of a triangular field is three times as large as the first angle. the third angle is 40⁰ greater than the first angle. How long are the angles?
Does the stability of protons and neutrons in the nucleus depend on the electrons ?
Which pair of lines are parallel? A. Y - 2x = -5 and 2x - y = -6 B. 2x + y = -5 and 2x - y = -6 C. Y- 2x = -5 and 2x + y = 6 D. 2x + y = -5 and 2x + y = 6
record the product. use expanded form to help.4x21=
What is 3.5 converted into a percent
Use prime factorization to find the GCF of 84 and 63
Given: Line UV bisects Line WZ at V. Draw the diagram and find the measure of Line WZ ifVZ=4a+3 and VW+15-2a