louie4285 louie4285
  • 25-05-2023
  • Business
contestada

An engineering firm recently conducted a study to determine its benefit (B)and cost (C) structure. The results of the study are as follows: B(Y) = 300Y - 6Y² C(Y)=4Y² So that MB = 300 - 12Y and MC = 8Y. You have been asked to determine the maximum level of net benefits and the level of Y that will yield that result.

Respuesta :

Otras preguntas

Daniel's goal is to walk 100 miles.• He walks 5 miles every day.• He has walked for 7 days. Daniel still needs to walk k more miles for his goal. Which equation
Do you agree or disagree and why?
PLEASE HELP ASAP Which transformations correctly map rectangle ABCD to rectangle A'B'C'D'?
Identify the tense forms used in the following sentences: Mr Smith is dining with the queen of England.
HELP PLSS!!!!! What is one example of foreign policy? OA. A government raising taxes on imports OB. A school creating a program for students who need to learn E
2/5% as a fraction in it's simplest form​
Find the surface area of the prism. 10 ft length 1 ft height 5 ft width
Choose the molecule that is most concentrated at each ph ?
Convert the fractions to decimals ​
The volume of this rectangular prism is 51,615 cubic yards. What is the value of v? (will mark brainliest)