groovymar1037 groovymar1037
  • 22-01-2024
  • Engineering
contestada

Engineering cost estimates are usually based on operating conditions that are considered:
A. optimal.

B. practical.

C. attainable.

D. historical.

E. realistic.

Respuesta :

Otras preguntas

During a soccer season, Mario made approximately 2 goal points for every 5 of his shots on goal.  What is the probability that Marion would make 2 goal points o
What do ancient India and ancient Egypt have in common?
Is 0.602 equvalent to 0.62
The scientific term for a living thing is
1st?- cynthia paid $0.20 per hobby magazine at a tag sale. She bought half of all the magazines that were for sale and paid $10. How many magazines were there i
Why do the track runners start at different positions on the track?
Joe has been keeping track of his cellular phone bills for the last two months. The bill for the first mont was $38.00 for 100 minutes of usage. The bill for th
In which one of the following sentences could you best use a semicolon? A If you ask me Jerry is a tennis whiz. B When she is worried Lucille eats a lot. C Jerr
there ate 4 more oranges than apples in the fruit bowl, there ate 5 more apples than bananas. there are 2 bananas. how many of each type of fruit is in the b
What features distinguish anthropoids from strepsirrhines