mathewmarandi8410 mathewmarandi8410
  • 26-04-2024
  • Mathematics
contestada

A can do a piece of work in 20 days. He works at it for 5 days, and then B finishes it in 10 more days. In how many days will A and B together finish the work?
a) 5 days
b) 6 days
c) 7 days
d) 8 days

Respuesta :

Otras preguntas

Linda fills the rectangular prism above (56 cubed inches) with cubes that have side lengths of 1/3 in. How many cubes does she need to fill in the rectangular p
Your computer supply store sells two types of inkjet printers. The first, type A, costs $267 and you make a $24 profit on each one. The second, type B, costs $1
4.7x=2.5x+8.8.....plz help me I don't like math
Please help! I am completely lost on these things
what method of mass production increased the supply and reduced the cost of automobiles
How would you solve #2 and #3?
When a tuning fork vibrates over an open pipe and the air in the pipe starts to vibrate, the vibrations in the tube are caused by ... A. Resonance B. Harmonics
What are the consequences of moving from underground mining surface mining?
can 3 ft, 4.5 ft, 5.75 ft make a triangle
The school cafeteria offered a choice of pizza or nachos to sixth-grade students. 37% of the sixth-grade class chose pizza. 77 students chose pizza. How many to