thetrojantv
thetrojantv thetrojantv
  • 23-02-2018
  • Mathematics
contestada

these are so hard please help me and answer the last 4 I posted

these are so hard please help me and answer the last 4 I posted class=

Respuesta :

Аноним Аноним
  • 23-02-2018
kai:
6 days = 1 shed
1 day = 1/6 shed

Mark:
8 days = 1 shed
1 day = 1/8 shed

Together:
1 day = 1/6 + 1/8 shed 

Ans: 1/6d + 1/8d = 1

Answer Link
carlosego
carlosego carlosego
  • 23-02-2018
The first thing you should know is that the rate of each one is:
 Kaitlyn = 1/6
 Mark = 1/8
 Then,
 d = number of days.
 The equation then if they work together is:
 1 / 6d + 1 / 8d = 1
 answer:
 the equation for number of days it would take to build the sheld together is
 1 / 6d + 1 / 8d = 1
Answer Link

Otras preguntas

How does a food cooperative differ from a warehouse store?
The diameter of the bottom of a lamp shade is twice the diameter of the top of the lamp shade. The top of the lamp shade has a 9-inch diameter. What’s the circu
2392 ÷ 64 what is the answear​
Units of Weight How many kilograms are equivalent to 5 pounds? 1.13 kg 2.25 kg 5.67 kg 11.05 kg
What is significant about the image of grass covering people who sacrificed their lives in war?
Most school systems rely on ___for most of their funding. Property taxes Sales tax Income taxes Lottery’s
In what way did the Qur’an affect the role of Islamic women? A. Women were given more legal rights B. Women could no longer own property C. Women were required
is coffee a solid liquid or gas​
what is the difference between p waves and s waves
what effect might the aging population have on the marketing of various goods and services?