concrete can be made by mixing cement, sand and gravel in the ratio 3:6:8. how much gravel is needed to make 850 cubic meter of concrete?

Respuesta :

ayrianaschaubowmrit
ayrianaschaubowmrit ayrianaschaubowmrit
  • 21-09-2018

400 cubic meters of gravel is needed to make 850 cubic meters of concrete.

If you wanna know how I got my answer then just ask. :)

Hope this helped!

Answer Link

Otras preguntas

Ming’s mother served him fried eggs for breakfast. After seeing the eggs, he noticed that they closely resembled a stage in cell division that’s common to both
Calculating the acceleration of two people pulling a box with same force and angle.
Alaina’s sugar cookie recipe calls for 2 1/4 cups of flour per batch. If she wants to make 2/3 a batch of cookies, how much flour should she use?
A rhombus has sides 10 cm long and an angle of 30°. Find the distance between a pair of opposite sides.
A bag contains 6 blue balls, 3 green balls and 3 yellow balls. What is the probability of choosing one blue ball and then a yellow ball with replacement? A.) 3/
what is 1/5 ×20 plz I need to know
how do barrier islands protect the main shoreline from erosion
what is 1/5 ×20 plz I need to know
the layer of earth that contains the tectonic plates is called the
A conglomeration is a rock that forms as result of