Qn.11 plz help this with step ​

Qn11 plz help this with step class=

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 25-07-2019
The answer is 7.5 days
explanation:
80 is four times 20.
80 people should be able to do the job four times faster than 20 people.
So, they should take 1/4 the time.
If 20 people take 30 days, 80 people should take 30/4=7.5 days.
**
simpler explanation:
30*20/80=7.5
Answer Link

Otras preguntas

Apart from its length,what makes a short story different from a novel
Is popping popcorn a physical or chemical change?How can you tell
Is Which one of the following statements is correct? A. A $20bill Is a gold Certificate.B.A $20 bill is a Treasury bill. C. A $20 bill is a Federal Reserve Note
What is the best definition of marginal cost? A. the possible income from producing an additional item B the price of producing one additional unit of a good
(Add 34 and 6) , Times 3 as an expression
what's the U.S.A's first state 10 POINTS. plz help
GEOMETRY The volume v of the prism is 1122 cubic inches. Use the formula V=Bh to find the height h of the prism. A hexagonal prism with height labeled h.
The two most important leaders of the great awakening in colonial america were ________.
sa se afle cinci unghiuri in jurul unui punct care au masurile invers proportionale cu numerele 2, 3, 4, 6 si 12
What is the constant of proportionality in the equation y = 7x?