adddcyyvjvyffy
adddcyyvjvyffy adddcyyvjvyffy
  • 21-10-2019
  • Mathematics
contestada

A conveyer belt can add a coat of paint to 2,100 in 15 minutes. How many can it paint per minute?​

A conveyer belt can add a coat of paint to 2100 in 15 minutes How many can it paint per minute class=

Respuesta :

kaerlyhairn1 kaerlyhairn1
  • 21-10-2019

Answer:

It can make 140 Coats of paint because you have to divide 2100 by 15 cause it makes it per 15 minutes so divide it to find the sum

Answer Link
irvins1 irvins1
  • 12-05-2020

Answer:

140

Step-by-step explanation:

Answer Link

Otras preguntas

What are the features of industrial society
Given that 3=a+r/a-r,make r the subject of the formula?​
‎Which revision of the passage best uses the images to develop the main character? ‎ ‎ (1) Steve walked into the ‎ ‎ café. (2) He smiled at the delicious smells
To get maximum current in a circuit, the resistance should be in _____1)series2)parallel​
guys help me I really need your help​
state the slope of the line y = 3x -7
one is the product of mainly socialization.justify this statement with example​
What are the resources og microeconomics?
You are designing a rectangular fenced outdoor space for your pet rabbit. Fencing material costs $15.25 per metre. You have $200. What dimensions give the great
Explain how one driving force has facilitated change at Domino’s.