jacksonj150 jacksonj150
  • 24-10-2019
  • Mathematics
contestada

A contractor has two choices for billing a completed job.

Respuesta :

mrusmason
mrusmason mrusmason
  • 24-10-2019

Answer:

I don't know what the question is but i think this the answer. The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

Step-by-step explanation:

Answer Link

Otras preguntas

expression using the numbers 7,5,6,3 to equal 75
What does the Strangler Fig eat and how?
Earth’s rotation causes surface currents in the Northern Hemisphere to A) curve clockwise B) move in straight lines. C) curve counterclockwise. D) move in di
how many minutes is 4:15 pm to 5:00 pm?
what is 28a^11 b^7 divided by 4a^3b
Expand the following logarithm: log of the square root of xy divided by 1000
the clubs indoor pool is a rectangular shape.Marco is laying tile around the pool to create a walkway whatbis the area of the pool
a trapezoid with a right angle and an area greater than 50
Animals store glucose in the form of A.amylose B.glycogen C.glycerol D.guanine E.cellulose
What is 2/3 x 1/2 x 3/4