True or False: Production runs can be scheduled in one or two shifts. A. True B. False

Respuesta :

BenitoMarin BenitoMarin
  • 23-01-2020

Answer:

The correct answer is letter "A": True.

Explanation:

The production run represents the number of units a company can produce during its production line. In some cases, the expected production line cannot be covered by one shift of employees. Then, the company allows overtime or implements a second shift to fulfill its objective.

Answer Link

Otras preguntas

Simplify ratio 1. 65:15 2. 56:45 3. 98:24 4. 380:56 5. 246:39 6. 98:112 7. 54:12 8. 87:15 9. 47:17 10. 90:117
PLEASE HELP! GRAPH THE FUNCTION
What is an equation of the line that passes through the points (4, -2) and (2, 3)?
Solve the following inequalities, if it is known that the function g is decreasing on its domain. g(5-x^2)≤g(3x-5), Dg=(-∞,4)
from the number of card numbered from 1 to 15 orchid is drawn from random find the probability of getting a card having a prime number​
What is an equation of the line that passes through the points (4, -2) and (2, 3)?
what is the volume of a cylinder,in cubic inches, with a height of 16 inches and base diameter of 4 inches? round to the nearest tenths place.
Can I? I really need your help, b'coz, I can't understand how to solve it. ​
The town of La Belle wants to build a soccer field. They want it to be 50 yards wide and 80 yards long. What is the total area of the soccer field? Show your pr
state the difference between a conductor and an insulator.[tex] \\ \\ \\ [/tex]thankyou ~​