Resource leveling is a network scheduling technique that seeks to assign nearly equivalent work units to each member of the project team True False

Respuesta :

Emhicee
Emhicee Emhicee
  • 26-01-2020

Answer:

False

Explanation:

Resource leveling in project management is a technique used to ensure that over-allocation of resource or conflicts as a result of over-allocation does not occur.

Cheers

Answer Link

Otras preguntas

If a substance is in the gas phase, which of qualities of the gas will stay constant? volume mass shape position of particles
What did malcolm x accomplish
French and english colonists competed with each other for _____.
What is the answer to tho equation ???
Write an equation of the line pictured in the graph.
please help!! you’ll get 22 points
What is the term for words from different languages that look similar and mean the same thing
im having trouble with this word problem. A train travels 160 km in the same time that a plane covers 720 km. if the speed of the plane is 20 km per hour less t
An item costs $380 before tax and sales tax is $11.40. Find the sales tax rate. Write answer as a percentage.
When was Nome discovered by the Europeans