Most projects will employ bottom-up estimating at some point to serve as a basis for estimating cash flow needs and for controlling the project.

True

False

Respuesta :

zuwairahdahir
zuwairahdahir zuwairahdahir
  • 25-01-2020

Answer:

The statement is TRUE

Answer Link

Otras preguntas

two rectangle have an area of 36 square inches name two possible perimeter so for the rectangles
A rectangle is 6 meters long and 5 meters wide. What is its area?
What is the molecular shape of SCl2?
What did England and the English settlers really want from colonization? National Glory? Wealth? Adventure? A solution to social tensions?
The first painter can finish a paint job in two hours. The second painter can finish the same job in 8 hours. How long will it take them to finish the job if th
how was France drawn into world war 1
how to write a story context that would be represented by the ratio 1:4
What is the value of t in this equation? 3t=t+3
Why was hospitality so important to the ancient Greeks? A. There was relatively little development in ancient Greece, so travelers had to rely on the kindness o
29) The Federal Reserve usually responds to inflation with which of the following: A) An increase in the discount rate B) A decrease in the discount rate C) The