aaliyahgbnl2002
aaliyahgbnl2002 aaliyahgbnl2002
  • 25-03-2020
  • Arts
contestada

What was the role of master builder?

Respuesta :

yusra33khatab
yusra33khatab yusra33khatab
  • 25-03-2020

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge

Answer Link

Otras preguntas

Recently, More Money 4U offered an annuity that pays 5.4% compounded monthly. If $1,132 is deposited into this annuity every​ month, how much is in the account
In the late 1800s, companies hired detectives to 1. Move employees top company towns 2. Negotiate with labor unions leaders 3. Force strikebreakers to take job
How and why does motion occur ??
Please help with this math problem
A hierarchical topology is also called a _____ topology.
whats the square root of pi
Is sea water close to being a saturated sodium chloride solution?
Which event essentially ended the era of Reconstruction? a.the Panic of 1873B.the election of President GrantC.the Supreme Court case United States v. Cruikshan
URGENT!Use the three-point general rubric to evaluate the paragraph.An Afternoon of Modern Art On saturday, I went to the Bates County Museum of Art with my par
Did the independence movement start in the north or south of latin ametica