alisa9 alisa9
  • 23-09-2016
  • Mathematics
contestada

30men can finish 1/7of a work in 2days.18men will do othe remaining work in ?

Respuesta :

chumxo chumxo
  • 24-09-2016
7/7-1/7=6/7 is the rest of work
1/7 work takes 2days
6*1/7=6/7 work takes 6*2days=12days
30 men takes 12 days to finish the rest of work (6/7)
18 men takes 18*12/30= 7.2days
Answer Link

Otras preguntas

Susie is having a party at a horse farm. The farm charges $45 for a party and 3$ per horse ride. If she spends $80 or more on the party, she gets a free month o
please Help me on this50 Points!!
Isotope a has a half-life measured in minutes, whereas isotope b has a half-life of millions of years. which is more radioactive?
Which of the following must be true for the graph of the function f(x)= (x^2 - 25)/5x - 25? There is: a. a removable discontinuity at x = 5 b. a vertical asy
What is the value of x in simplest radical form?
What is the equation of the function that is graphed as line a?
a spring length of 20cm, the vibrational frequency of the spring is 15 Hz, about that spring period is?
Evaluate e^-2to one decimal place.
24 is 15% of what percent
If you enter a bright room after being in the dark, what happens to your pupils?