What does the measurement tell you?

Estimate at completion

Respuesta :

Аноним Аноним
  • 21-10-2020

Answer:

forecasted cost of the project, as the project progresses/"The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete." - PMBOK Guide

Explanation:

Answer Link
austin121212 austin121212
  • 21-10-2020
Measurement tells u the accurate measure of something
Answer Link

Otras preguntas

Select the correct definition from the dropdown below: Select a Value Select a Value A point is formed by two rays with the same endpoint. An angle is formed by
Please help me with my homework i will give you alot of points
-7/10 is at least twice a number k minus 4. Write an inequality.
What advantages did societies that depended on staple crops have over non-agricutural societies? What disadvantages did they have?
What is Toni Morrison's tone in "The Reader as Artist"
Simplify: (6x-4) (9x-2)
there are 15 black marbles and 10 white marbles in a bag. If you pick a marble from the bag without looking, what are your chances of picking a white marble?
Où est-ce que nous ________ l'avion? prendrons prenons avons pris prenions
A worker is pushing a crate of tools up a ramp into a truck. The crate has a mass of 120 kg and is accelerating at a rate of 1.05 m/s^2. Once he finishes pushin
Is 0.3 concentration high or low and why?