GrimReaper666 GrimReaper666
  • 23-02-2021
  • Mathematics
contestada

Robert takes 10 days more than Peter to complete a job. If they work together they will
complete the job in 12 days. How long will Peter alone take to finish the job?

Respuesta :

dede70800 dede70800
  • 23-02-2021

Answer:

I believe the answer is 2

Step-by-step explanation:

Answer Link

Otras preguntas

A single​ 6-sided die is rolled twice. find the probability of getting a 55 the first time and a 11 the second time. express the probability as a simplified fra
The term meaning any degenerative disease of the brain is
What is the slope intercept form of 6x + 2y = 24?
what number is 8.2% of 50
Does puerto rico participate in the olympics
In Achebe’s Things Fall Apart, Okonkwo finds his son Nwoye’s signs of laziness “disquieting” because it reminds him of _____.
The perimeter of a rectangle is cm. find the lengths of the sides of the rectangle giving the maximum area.
Which of the following identifies ways people can fight obesity with lifestyle changes? lap band surgery to lose weight physical activity and portion control wa
You deposit $5000 each year into an account earning 8% interest compounded annually. How much will you have in the account in 20 years?
Which number can be written as a fraction?