ShacandGion ShacandGion
  • 22-11-2016
  • Social Studies
contestada

When one party to a contract fails to perform as promised, it is called?

Respuesta :

caitlinturosky
caitlinturosky caitlinturosky
  • 22-11-2016
This scenario is known as Breach of contract
Answer Link

Otras preguntas

Which contribution to the body of scientific knowledge is most recent? a)the development of the lever b)the confirmation of the double-helix structure of DNA c)
Which particle is emitted when an atom of 85Kr spontaneously decays? (1) an alpha particle (3) a neutron (2) a beta particle (4) a proton
Margo boils 500 L of water to make 80 g of the pasta is Margo boils 2500 mL of water how many grams of pasta can she make?
Which were included among the three principles of the people check all that apply
The representatives anticipated that the Declaration of Rights and Grievances would lead to:
The measurement of an angle is five times the measurement of its supplement.What is the measurement of the angle? Is it 30°, 35°, 40°, or 45°?
You paint 12 wall in 14 hour. At that rate, how long will it take you to paint one wall?
In the gold foil experiment, a thin sheet of gold was bombarded with alpha particles. Almost all the alpha particles passed straight through the foil. Only a fe
Locate the subordinate clause in the following sentence, and identify it as a noun, adjective, or adverb. The woman who just finished the marathon is tired. typ
Secretary of State John Hay sent his Open Door Notes (1899–1900) to world powers to (1) keep Chinese workers from coming to America (2) secure a fair settlement