contestada

what is the first step in the project control process for measuring and evaluating project performance?

Respuesta :

Trisha333 Trisha333
  • 24-04-2022

Answer:

Setting a baseline plan.Measuring progress and performance.Comparing plan against actual.Taking action.

Answer Link

Otras preguntas

What do sergeis action tell them about his personality??
How did Rome's political influence expand as it conquered new territories? a.Rome spread its republican government to its new provinces. b. Rome allied itself w
does the culture of time in which the constitution was written excuse inequalities that the document allowed?
Which was not characteristic radio in the 1950s? A. popularization of African-American culture B. focus on local and community interests C. focus on specialized
a shopper seeking a bargain combined a 25% off coupon with the store's existing 25% off sale, and brought enough money to cover 50% of the base price. why did t
hang on just a second, i need to take this call.” this statement violates which principle of active listening
how might the location of South Korea influence its location and politics?
What was it like in Europe with government and religion?
if pes represents the potential energy stored in a spring in kg•m^2/s^2 and x represents the change in the springs length from its equilibrium position im m wha
the diameter of a red blood cell is about 0.00000615 m. estimate the diameter of the red blood cell as a product of a single digit and a power of 10. enter the