maddiewatts9447 maddiewatts9447
  • 25-08-2022
  • Mathematics
contestada

You are considering a project that has an initial outlay of $1.6 million. the profitability index of the project is 2.44. what is the npv of the project?

Respuesta :

Parrain
Parrain Parrain
  • 29-08-2022

Based on the profitability index and the initial outlay of the project, the NPV of the project is $2.304 million

What is the project's NPV?

The Profitability index is found by the formula:

Pi = 1 + NPV / Initial outlay

Solving for the NPV gives:

2.44 = 1 + NPV / 1.6 million

NPV / 1.6 million = 2.44 - 1

NPV = 1.44 x 1.6 million

= $2.304 million

Find out more on profitability index at https://brainly.com/question/3805108

#SPJ4

Answer Link

Otras preguntas

The sum of two numbers is 17 and their different is 5. Find two answers
Homophones ~~~ a) a female sheep / an evergreen tree b) sandy shore / kind of tree c) guided / a metal d) opens lock / harbour e) flat land / joiner's tool f)
What expression represents the number of squares in terms of the figure number?
The name of each contestant is written on a separate card, the cards are placed in a bag, and three names are picked from the bag. Identify which type of sampli
Find the domain of each rational expression. f(x)=5x-7/4
How do I solve for x and state the restriction if (a-c)/(x-a)=m
sue stacked one box onto another. the bottom had the height of 2 1/3 feet and the top box had the height of 3 2/3 feet. how tall were the stacked boxes?
show by a simple experiment that diffusion becomes faster when temperature is raised
Which Kelvin temperature is equal to 200.°C?
Julius Caesar, hero or tyrant?! And why????