josephb607
josephb607 josephb607
  • 26-04-2017
  • Mathematics
contestada

A conservation group planted 75 trees in 5 days.  What was their rate of work?

Respuesta :

sydneyschachter
sydneyschachter sydneyschachter
  • 26-04-2017
15 trees per day
75/5=15
Answer Link
jordanarcher17 jordanarcher17
  • 26-04-2017
They would be planting 15 trees a day.
Answer Link

Otras preguntas

If a quadrilateral has three angles measuring 60',45' and 100' what is the angle of the fourth angle
Explain the difference between a undefined term and defined term In geometry
What is an integer whos absolute value is greater than its self
Ms smith has 28 sixth graders and 35 seventh graders for math. If she wants to break the two grades into identical groups without any students left over how man
A van traveling down a slope with a uniform acceleration of 2.15 meters/second2 attains a speed of 20.00 meters/second after 7.00 seconds. What is the initial v
A(n) blank is a representation of something in the natural world
The inner 1,000,000 is an exponent of ten is that true
riddle me this whats all the colors of the rainbow but never seems happy answer will be on my page of the color riddle
Identify the italicized phrase in the following sentence. Running out of gas, the car came to a stop. It is used as a(n):
How is place value used to read decimals